Bushfire shutters should be part of your building plans, not a last-minute addition. If you are building or renovating in a bushfire-prone area, discussing your shutters before finalising windows and cladding can help avoid expensive changes later.
At Shutter World, we offer free consultation to help homeowners, builders and designers plan their bushfire shutters early. For our BAL FZ shutter projects, the conversation includes the heroal 37 mm stainless steel profile, glazing, mounting details and how the shutters will operate if mains power is unavailable.
BAL stands for Bushfire Attack Level, a measure of a building’s potential exposure to embers, radiant heat and direct flame contact. BAL FZ means Flame Zone, the highest BAL category, where a building may be directly exposed to flames from a bushfire front (NSW Rural Fire Service).
Your required BAL should come from the assessment and approval process for your property, rather than a guess based on how close the bush looks. The NSW RFS explains that location, vegetation, separation distance and slope all affect the assessment (NSW Rural Fire Service).
Before choosing shutters, have your BAL assessment and relevant building plans ready. These give your shutter supplier, designer and certifier a clearer starting point.
Windows and doors are vulnerable points in a building, and glazing is susceptible to radiant heat and flying debris (NSW Rural Fire Service). That is why bushfire protection needs to be considered as a coordinated building detail, rather than simply choosing a metal shutter.
Shutter World uses a heroal 37 mm stainless steel profile for its BAL FZ shutters. However, specifying that profile is only the beginning: the proposed shutter, window, glazing and installation must be checked against the documentation applicable to the supplied system.
Do not assume an ordinary security shutter, or a BAL 40 product, is automatically suitable for a BAL FZ opening. NSW RFS has specifically withdrawn an earlier temporary arrangement allowing BAL 40 windows with non-combustible shutters in the Flame Zone, with its stated grace period ending on 1 January 2018 (NSW RFS window-protection fact sheet).
For the BAL FZ shutter configuration supplied by Shutter World, our planning requirements include:
These are requirements for our specified configuration, not a universal specification for every BAL FZ product. Before ordering, ask us to confirm the complete window and shutter arrangement against the applicable system documentation and your project’s approval requirements.
Glass thickness alone does not establish compliance. Frame construction, opening dimensions, mounting arrangements and the precise clearance detail also need to be checked as part of the proposed installation.
For example, selecting your windows before discussing the shutter position may leave an awkward clearance or mounting detail to resolve later. An early review gives the design team an opportunity to coordinate these details before products are manufactured.
If your home has angled or overlapping cladding, Shutter World recommends discussing suitable architraves around the openings at the design stage. The aim is to provide an appropriate mounting surface for the shutter system, rather than trying to solve the fixing detail after the cladding is complete.
The architrave specification should be coordinated with the builder and checked against the shutter’s installation requirements. Do not assume that adding a standard decorative trim will, by itself, make the installation compliant.
Bring a wall section or cladding detail to your consultation if one is available. We can discuss the proposed mounting arrangement before it becomes a difficult site issue.
The right operating method should be discussed alongside the shutter’s size and the way you will use it. Shutter World offers the following options, subject to suitability for the individual shutter:
A manual override provides a way to operate the shutter without relying on the normal electrical control. A UPS, or uninterruptible power supply, provides backup electrical power; ask us to confirm its compatibility, capacity, maintenance needs and operating limitations for your installation.
Do not leave the backup method until handover. Include control locations, access to the manual override and the proposed backup equipment in the design conversation, then request a demonstration of normal and backup operation.
heroal’s bushfire-system brochure states that its BAL certification applies when the shutters are fully closed (heroal bushfire protection systems). A partially lowered shutter should therefore not be treated as providing the system’s rated bushfire protection.
Ask for clear operating and maintenance instructions, and include shutter closure in your household’s bushfire planning. Do not wait until an emergency to learn how the controls or backup system work.
Shutters are one part of a wider protection strategy, not a reason to delay leaving or disregard emergency advice. NSW RFS stresses that no single protection measure provides sufficient protection on its own (NSW Rural Fire Service).
BAL FZ shutters are a significant investment, so it makes sense to resolve the specification before construction decisions become difficult to change. Shutter World recommends reviewing these points while your design is still flexible:
The goal is not simply to add shutters to a finished house. It is to coordinate the shutters with the house from the outset.
Planning a new home, extension or renovation in a bushfire-prone area? Speak with Shutter World before finalising your windows, cladding and electrical arrangements.
Bring your plans, BAL assessment and any proposed window or cladding specifications. We offer free consultation to discuss your shutter requirements and identify details that need attention before you commit to construction.
Explore our BAL FZ window shutters and bushfire shutter range, or visit Shutter World to enquire about a free consultation.
This article is general planning information, not a project-specific compliance assessment. Final specifications and installation must be confirmed against the supplied system’s applicable documentation and your project’s approval requirements.